Saturday, December 13, 2008

All 4 walls now up.




All four walls are now framed and up. 2 20"x20" windows on the south wall. 9'wx7h garage door. Used 17' LVL on front front wall.

Tuesday, December 2, 2008

First wall up




Forgot to add the picture of the cement truck and pumper truck. Figured I would get rid of the driveway settling problem where the driveway meets the garage floor. Had them install a 6' apron.